by: HarveyB |
last post by:
I would like to generate non-modal popup windows from
ASP.Net code-behind. I have tried using Client Side
scripting like "function Test(){
window.open('test.htm',_blank,...
|
by: Richard Cornford |
last post by:
For the last couple of months I have been trying to get the next round
of updates to the FAQ underway and been being thwarted by a heavy
workload (the project I am working on has to be finished an...
|
by: Sue |
last post by:
Help! I have an asp table with an embedded table. The asp
tablerow that contains this table has a static ID assigned
of "FilterRow2" (see snippets of code below). When I click
on the button to set...
|
by: Mong |
last post by:
Hi,
I have a webform with various asp controls on it such as textboxes and
dropdownlists. I'm fairly new to asp.net coming from VB6 and am
wondering when it's best to use client side events and...
|
by: ruca |
last post by:
Hi gurus,
I have a imagebutton in my WebForm, and I want that when I click (mouse
down) on her the imagebutton change image and when I "unclick" (mouse up)
change to the original image.
Basically...
|
by: IchBin |
last post by:
I am trying to set the state of a radio button. I do not see what I am
doing wrong. Sorry, I am new at this.. I need another set of eyes to
look at this snip of code. I am trying to set the radio...
|
by: lmttag |
last post by:
Hello.
We're developing an ASP.NET 2.0 (C#) application and we're trying to
AJAX-enable it. We're having problem with a page not showing the page while
a long-running process is executing. So,...
|
by: Ankur |
last post by:
Hi Folks,
I am new for this group. I want to clarify one thing what's a basic
difference between Client Side Java Script and Server Side Java
Script. how we can differentiate it. Why we called...
|
by: ubohra |
last post by:
Hii all,
Need your help!!
I am got stuck into a problem that we have a application where there are some pages to display some courses which the user will take.
I have to change the order of that...
|
by: pvong |
last post by:
Doing this in VS2008 and VB.Net.
I new at this and don't know how to program in Java. Can someone help me
write a simple little java code to change the backgroup color of my table?
Table ID =...
|
by: emmanuelkatto |
last post by:
Hi All, I am Emmanuel katto from Uganda. I want to ask what challenges you've faced while migrating a website to cloud.
Please let me know.
Thanks!
Emmanuel
|
by: nemocccc |
last post by:
hello, everyone, I want to develop a software for my android phone for daily needs, any suggestions?
|
by: marktang |
last post by:
ONU (Optical Network Unit) is one of the key components for providing high-speed Internet services. Its primary function is to act as an endpoint device located at the user's premises. However,...
|
by: Hystou |
last post by:
Most computers default to English, but sometimes we require a different language, especially when relocating. Forgot to request a specific language before your computer shipped? No problem! You can...
|
by: Oralloy |
last post by:
Hello folks,
I am unable to find appropriate documentation on the type promotion of bit-fields when using the generalised comparison operator "<=>".
The problem is that using the GNU compilers,...
|
by: Hystou |
last post by:
Overview:
Windows 11 and 10 have less user interface control over operating system update behaviour than previous versions of Windows. In Windows 11 and 10, there is no way to turn off the Windows...
|
by: tracyyun |
last post by:
Dear forum friends,
With the development of smart home technology, a variety of wireless communication protocols have appeared on the market, such as Zigbee, Z-Wave, Wi-Fi, Bluetooth, etc. Each...
|
by: agi2029 |
last post by:
Let's talk about the concept of autonomous AI software engineers and no-code agents. These AIs are designed to manage the entire lifecycle of a software development project—planning, coding, testing,...
|
by: isladogs |
last post by:
The next Access Europe User Group meeting will be on Wednesday 1 May 2024 starting at 18:00 UK time (6PM UTC+1) and finishing by 19:30 (7.30PM).
In this session, we are pleased to welcome a new...
|