Hi Seth;
I have experienced the same problem with a simple "Save As" from MS
Project 2000(build 9.0.2000.0224) to a DB2 UDB V8.1.3 on Windows XP
Pro. I couldn't spend a ton of time on it, but a cursory look led me
to believe it was a data type incompatibility between SQL2000 "text"
data type and what ODBC tried to send to DB2. Hope this helps. If I
get a chance, I'll try to look into it more and will definitely watch
this thread with interest.
Pete H
yo********@yahoo.co.uk (Seth) wrote in message news:<b9**************************@posting.google. com>...
Hi all,
I am trying to get MS Project to create and save data back to DB2 via
the IBM ODBC driver. Both MSSQL and Oracle work, but when saving back
to DB2 it crashes leaving the DB with only 3/4 of the tables created.
Has anyone had experience with this system configuration ?
If not, could anyone suggest some data migration tools so I can
convert the Oracle db schema into DB2...
Thanks in advance
Seth