Hi,
I was wondering if any body could help me. I am using the calendar below as a template but I need to include within it a time scheduler. So for each day (per employee) I would like a time scheduler to pop up which would have time feilds in which I can input a task or assign it to holiday. Does anybody have any idea how I could possibly implement that?
Thanks you so much in advance
[Moderator's note: I have moved this post into its own thread from this long calendar thread to which it does not belong.]